Previously occupied for office use, Brook House is being converted and extended to provide a 179 Bedroom Hub by Premier Inn. The Supply & Installation of the Acoustic Cradle & Batten Flooring on the 1st Floor and 2nd Floor needed to achieve and provide service voids and flooring depths of 95mm – 185mm – 200mm – 450mm and 550mm. There was also a requirement for a higher performance specification in the bedrooms over the reception area and restaurant.

As the site is ‘Material Change of Use’, conversion from Offices to Habitable Dwellings, the 1,000 sq m2 project was required to provide sound test certificates from on-site tests in order to achieve compliance with Approved Document E Building Regulations, which came into effect in July 2003. The UKAS cradle & batten system has achieved test results well in excess of the requirements when tested on this project and similar developments throughout the UK.

UK Acoustic Systems provide a nationwide coverage and supply & install acoustic flooring on a great variety of sites in differing locations. However, our key strengths, expertise and experience in the London Area, with Offices being converted to Flats or Hotels, enabled us to provide the deep floor void depths as well as meet and exceed the timescales in Main Contract Works Programme.

01 / 01
Back to all projects
Project name
PREMIER INN, BROOK HOUSE
Location
Brook House, Westminster, London
Contractor
Bay Construct
System installed
UKAS Acoustic Cradle & Batten
PDF Download
Project Case Study
Share

Related projects

Back to all projects