BARDSLEY CONSTRUCTION – THE EDGE

This £7.88 million Student Accommodation project started in 2014 and is a Timber Frame construction specifically designed as a Student Accommodation Residential Development and Halls of Residence for Liverpool University.

The specification consisted of 231 studio apartments fitted with 28mm Knauf Brio 18WF acoustic flooring. The project which is located close to Lime Street Station in Liverpool City Centre, was extremely complex with a phased construction and installation programme. The need for part floor installations on different floor levels meant that communication between UK Acoustic Systems and the Main Contractor was vital at all times.

Bardsley Construction called upon us to install the shallow high density acoustic flooring system, because we have installed over 40,000 sq metres of Knauf Brio flooring in the past 18 months. We were also recommended by another Main Contractor as UK Acoustic Systems are a National UK Approved Installer of Knauf Brio products with a wealth of experience and expertise with this particular system. We hope our partnership will continue with Bardsley Construction in the following years within the residential market.

01 / 01
Back to all projects
Project name
BARDSLEY CONSTRUCTION – THE EDGE
Location
Liverpool
Contractor
Bardsley Construction
System installed
28mm Knauf Brio 18WF Acoustic Flooring
PDF Download
Project Case Study
Share

Related projects

Back to all projects