Home
Projects
Knowledge hub
Blog
About Us
Meet The Team
Contact
The systems’ minimum height makes it ideal for refurbishment projects
Related to the minimum heat, the system features a noticeably quick heat response
The system can be simply laid on top of the existing floor, without the need on an additional system
The castellated underfloor heating system, designed for refurbishment projects where floor build up has restrictions. The system incorporates a 12mm heating pipe within a plastic castellated panel, which is then covered with 20mm of reinforced levelling compound.
The way that this system is designed means that it must be laid directly onto a structural and level subfloor, not onto any loose flooring or insulation layer. This can be a concrete sub floor or chipboard floor, but it must be a structural layer as the 20mm compound is not structural in its own right.
The systems heat response time is around 15-30 minutes (depending on the floor covering), very similar to the response time of a radiator.
We recommend the use of a fibre-reinforced levelling compound. Most floor finishes can be laid directly on top of the system.